Retail Hoarding Graphics for Store Openings: A Timeline Checklist for Brand Managers
By Rapid Retail Graphics Production Team — Production Specialists, 12+ Years in Retail Graphics

Store openings run on fixed dates. The lease sets the deadline, the landlord holds you to it, and your marketing team has already announced the launch. Hoarding graphics sit at the intersection of all three pressures — and they're where timelines collapse more often than brand managers expect.
The failure mode is rarely a bad print. It's a missed handoff. Someone assumed artwork was further along than it was, or that mall ops approval would take two days instead of five, or that the installer could access the site during trading hours. The wall goes up late, or not at all, and the opening looks unfinished.
This checklist covers the full timeline — from lease execution to install completion — so your team knows exactly when each step needs to happen and who owns it.
Why Hoarding Timelines Compress Faster Than Expected
Most brand managers budget time for print and install. They don't budget enough time for what happens before print.
Site surveys, artwork adaptation, landlord approvals, COI submission, and mall ops scheduling each carry their own lead time. None of them run in parallel unless someone actively coordinates them. Treat hoarding as a print job rather than a coordinated production sequence and you'll lose a week before a file ever reaches press.
The clock starts when the lease is signed, not when you brief your vendor.
The Full Hoarding Graphics Timeline Checklist
Stage 1: Lease Execution to Vendor Brief (Weeks 6–8 Before Opening)
Confirm hoarding dimensions immediately after lease execution. Landlord drawings are often indicative, not exact. A 40-foot wall at a Cadillac Fairview centre will not match the dimensions at an Oxford Properties centre two cities over — and neither will match the drawings exactly once you're on site.
- Engage your hoarding graphics vendor within 48 hours of lease execution
- Request a site survey — not a measurement estimate based on drawings
- Confirm whether the landlord requires a specific substrate, finish, or panel configuration
- Identify the tenant coordination portal for the specific centre and confirm submission requirements
The failure mode here is waiting until creative is ready before briefing the vendor. Site surveys and artwork templates need to happen in parallel with creative development, not after it.
Stage 2: Artwork Development and Adaptation (Weeks 4–6 Before Opening)
Hoarding is not a billboard. A campaign asset that works at 6 feet by 4 feet will not automatically work at 60 feet by 10 feet. Panel breaks, column interruptions, and viewing angles all affect how the artwork reads in the space.
- Provide your vendor with existing brand files and campaign creative
- Request artwork templates sized to the actual surveyed dimensions, with panel breaks marked
- Review artwork at scale — at 100% zoom on screen, not reduced to fit a monitor
- Confirm CMYK colour mode and 300 DPI at final print size before artwork approval
Your vendor should be adapting creative to the hoarding layout, not simply scaling it up. If they're not flagging panel break conflicts or viewing distance issues, that's worth paying attention to.
Stage 3: Landlord and Mall Ops Approval (Weeks 3–5 Before Opening)
Approval timelines vary by landlord. Ivanhoé Cambridge centres typically require submission through a tenant coordination portal with a defined review window. Oxford Properties and Cadillac Fairview have their own processes, and requirements differ by centre.
- Submit artwork to the tenant coordination portal with all required file formats (typically PDF, with separate layered files if requested)
- Include all required documentation: brand guidelines, finish specifications, and any landlord-required signage schedules
- Track submission confirmation — portal acknowledgment is not the same as approval
- Budget 1–5 business days for landlord review; some centres take longer during peak fit-out periods
COI submission is not optional. Mall ops will not schedule the install without a current Certificate of Insurance naming the landlord and property manager as additional insureds. If your vendor's COI expires between submission and install date, the install will be blocked regardless of where artwork approval stands.
Stage 4: Print Production (Weeks 2–3 Before Opening)
Print production for hoarding graphics typically runs 1–5 business days for standard projects once print-ready files are confirmed. Rush production is possible but depends on press availability and substrate.
- Confirm print-ready file approval in writing before production begins
- Verify substrate selection against landlord requirements — some centres specify minimum material thickness or restrict certain adhesive types
- Confirm panel quantities match the surveyed wall configuration, not the drawing dimensions
- Identify any access restrictions affecting delivery: loading dock hours, freight elevator availability, security escort requirements
The failure mode here is approving artwork before confirming it's print-ready. A file your creative team has signed off on may still need to be converted to CMYK, have bleeds added, or have fonts outlined before it can go to press. That takes time — and it's often discovered the morning production is supposed to start.
Stage 5: Install Scheduling and Mall Ops Coordination (Weeks 1–2 Before Opening)
Install scheduling is a separate process from artwork approval. Landlord approval of the artwork does not mean mall ops has scheduled the install. Those are two different departments, and they don't always communicate automatically.
- Confirm install date and access window directly with mall ops — not through the leasing team
- Verify whether the install requires after-hours access, a security escort, or a specific loading dock booking
- Confirm the installer has a current COI on file with mall ops for the specific centre
- Request photo proof of completion — this is your record if a deficiency notice is issued later
Installs scheduled during trading hours create risk. Foot traffic, noise restrictions, and centre policies can delay or halt work mid-install. After-hours installs avoid most of these issues and are standard practice for experienced vendors.
Stage 6: Post-Install Review and Deficiency Response (Opening Week)
A deficiency notice from mall ops is not uncommon. Panel alignment, finish condition, or artwork placement can all generate a correction request — and the response window is usually short.
- Walk the hoarding wall before opening day, not on opening day
- Document any visible issues — bubbling, misaligned panels, colour inconsistency — with photos and timestamps
- Confirm with your vendor that deficiency response is included in scope, not billed as a separate call-out
The failure mode here is assuming the install is final until someone tells you otherwise. Mall ops may issue a deficiency notice the morning of your opening. If your vendor isn't reachable and doesn't have a rapid response process, you're managing it yourself.
Where Brand Managers Lose Time
Three handoffs account for most hoarding delays.
Creative to vendor. Brand teams hold files until internal approval is complete, then brief the vendor. By that point, the survey hasn't happened, the artwork template doesn't exist, and the landlord approval window is already tight.
Vendor to landlord portal. Files submitted in the wrong format, missing bleeds, or in RGB get rejected. The review clock resets. Two days lost, sometimes more.
Approval to install scheduling. Artwork approval and install scheduling get treated as sequential when they should overlap. Mall ops scheduling takes time. Waiting for approval before contacting mall ops adds unnecessary days to the back end of the timeline.
If you're managing a multi-location rollout, these problems scale badly. Each centre has its own portal, its own approval timeline, and its own mall ops contact. Someone on your team has to track all of it, or it falls through.
Working With a Full-Service Vendor
A vendor who handles only print and installation puts the coordination burden on your team. Site surveys, artwork adaptation, landlord submission, COI management, and mall ops scheduling all require active management. If your vendor stops at print delivery, you're running the rest yourself.
Rapid Retail Graphics manages the full sequence — site survey through final install — with an average lead time of 1–5 business days from artwork approval. Rush options are available for compressed timelines. See pricing & turnaround for an all-in line-item scope, or get in touch via the contact page.
For projects with non-standard requirements, the hoarding graphics for pop-up retail guide covers what changes when the scope is temporary or the timeline is tighter.
If you're new to hoarding as a format, this plain-language guide to retail hoarding covers the basics without padding.
And if a previous vendor has already cost you time on a launch, five reasons your hoarding vendor is slowing your store opening covers the specific patterns that repeat most often.