    Lease Timeline Compliance Checklist for Retail Hoarding Graphics

    Everything a retail project manager has to clear between lease signing and an installed hoarding wall — landlord submission pack, artwork approval, fire ratings, insurance, after-hours access, install, and the removal obligation most teams forget until the store opens. Production takes 1–2 days; approvals and access booking are what actually decide whether you hit the lease date.

    By Bryce Mitchell · Updated September 2026 · About Rapid Retail Graphics

    The Checklist, Stage by Stage

    Requirements vary by property — always confirm the specifics with the landlord or property manager. See the survey-to-install process for what each stage needs from your side.

    1. Lease signed / possession confirmed

    Day 0

    • Confirm the landlord's hoarding standard and any property-specific design criteria package
    • Confirm who supplies the structural hoarding: general contractor, landlord, or graphics vendor
    • Record the required hoarding height, setback, and any door, hatch, or viewing-window requirements
    • Note the trading-hours restriction and the after-hours access window for the property

    2. Site survey booked

    Within 1 business day of brief

    • Laser-measured templates for every hoarding wall run
    • Obstruction map: columns, sprinklers, power outlets, service doors, floor transitions
    • Photos of adjacent storefronts for finish and sightline reference
    • Confirm panel break positions before artwork begins

    3. Landlord submission pack assembled

    5–15 business days before target install

    • Scaled artwork proof laid out to survey templates
    • Substrate and fire-rating certificates (Class A / equivalent as the property requires)
    • Certificate of insurance naming the landlord and property manager as required
    • Installer crew list, credentials, and WSIB/WCB or equivalent coverage
    • Hot-work or ladder/lift permits where applicable
    • Requested install date and crew arrival/departure times

    4. Artwork approval

    1–5 business days (operator dependent)

    • Brand team sign-off on adapted panels before submission, not after
    • Landlord marketing sign-off on content, tenant naming, and opening-date claims
    • Written approval logged with date and approver name — verbal approvals stall installs
    • Any revision round re-submitted with the same pack so the clock does not restart

    5. Production

    1–2 business days after approved artwork

    • Print, laminate, and cut to survey-accurate panel sizes
    • Match panel numbering to the install drawing
    • Confirm freight arrival ahead of the booked install night

    6. Installation

    Typically one night, after trading hours

    • Confirm dock, freight elevator, and security escort booking 48 hours ahead
    • Confirm the loading and staging area with mall operations
    • Photo proof of completion issued the same night
    • Site left clean and clear before the property opens

    7. Removal obligation

    Scheduled to store opening

    • Check the lease for who owns removal and make-good of the hoarding line
    • Book deinstall as its own access window — it is a separate mobilisation
    • Adhesive clean-down and disposal of panels
    • Final condition photos for the landlord file

    How Far Ahead to Start

    Lead times below assume the 1–5 business day production and install window documented in the cost & timeline guide, with the rest of the calendar going to approvals and access booking.

    ScenarioStart before installWhy
    Single storefront, artwork ready7–10 business daysSurvey, submission, approval, print, one install night
    Single storefront, artwork from scratch12–15 business daysAdds design origination and an extra brand approval round
    Strict-approval landlord15–20 business daysAssume a full week of landlord review plus one revision round
    Multi-location rollout3–6 weeks per wavePer-site surveys and staged install nights across markets
    Rush, print-ready artwork approved24–48 hoursOnly where landlord approval is already in hand

    On a tight lease deadline? See how to manage hoarding graphics during a lease renovation on a tight timeline.

    How This Checklist Was Built

    The stages and lead times come from Rapid Retail Graphics project records for mall hoarding programs across 25+ metros across the United States and Canada, including single-unit fit-outs and multi-location rollouts. Individual landlords set their own submission requirements, so treat this as a baseline to confirm against the property's design criteria package rather than a substitute for it.

    Free to use and cite with attribution to Rapid Retail Graphics and a link to this page. For the underlying detail or a comment, see the press kit or email bryce@rapidretailgraphics.com.

    Pair It With the Spec Sheet

    Retail Hoarding Graphics Spec Sheet (PDF)

    Panel sizes, substrates, bleed and resolution, and install requirements — the technical half of the submission pack.

    Compliance FAQ

    Want us to run the submission for you?

    We assemble landlord packs, fire-rating documentation, COIs, and after-hours access bookings as part of every install. Send your lease dates and we'll work backwards from them.

    Vancouver, British Columbia — serving the US and Canada

    +1 (604) 220-7700

    bryce@rapidretailgraphics.com