Brand Managers Approving Hoarding Artwork: The Checkpoint Process Explained
By Rapid Retail Graphics Production Team — Production Specialists, 12+ Years in Retail Graphics

Artwork approval for hoarding graphics looks straightforward until you're three days from an install date and a file is sitting rejected at a checkpoint nobody flagged during briefing. The process involves at least two distinct approval tracks — internal brand review and mall ops sign-off — and they run on different timelines, with different requirements, and different consequences when something fails.
This article walks through how the checkpoint process actually works, where it breaks down, and what brand managers need to control on their end before the file ever reaches the landlord.
The Two Approval Tracks Run Simultaneously, Not Sequentially
Most brand managers treat artwork approval as a linear sequence: internal sign-off first, then submission to mall ops. That sequence adds unnecessary time and creates a specific failure mode.
Your internal team approves a file built to the wrong panel configuration, or sized to a template that doesn't match the actual hoarding dimensions. Mall ops rejects it. Your internal stakeholders have already signed off on a version that can't be used, and now you're restarting both tracks simultaneously under a compressed timeline.
Run both tracks in parallel from the start. You need the landlord's hoarding specs, template, and any centre-specific artwork guidelines before internal creative work begins. Not after the first proof. Before.
What Mall Ops Requires Before Artwork Submission
Every centre has a tenant coordination portal or a designated mall ops contact who manages hoarding artwork submissions. Requirements vary by landlord, but the common checklist across Cadillac Fairview, Oxford Properties, and Ivanhoé Cambridge centres includes:
- Artwork files at 300 DPI minimum, sized to actual hoarding dimensions with bleed
- CMYK colour mode — not RGB, not mixed-mode files
- Panel break indicators showing where the graphic crosses structural seams
- COI from the installation vendor naming the landlord as additional insured
- A completed artwork submission form from the tenant coordination portal, typically requiring the tenant name, lease number, and install date
The COI is not optional. Mall ops will not schedule the install without it, regardless of where the artwork approval stands.
If you're working with a vendor who handles the full scope — survey, print, and install — they should be submitting the COI directly. If print and install are separate vendors, confirm which party is providing it and that it names the correct entity on the certificate.
For a full walkthrough of the submission sequence, the step-by-step guide to mall operations approval for hoarding graphics covers the process in detail.
The Internal Brand Approval Checkpoint
Internal review has its own failure modes, separate from mall ops. The most common: a brand stakeholder approves a proof without realising the hoarding layout requires the primary visual to be split across a panel break.
What this means practically: a face, a logo lockup, or a product hero shot lands directly on a structural seam. The print looks correct in the PDF. On the wall, the panel break runs through the centre of the image. Mall ops may flag it as a deficiency, or the install crew raises it on-site — at which point you have a reprinting problem on a live timeline.
Brand managers approving hoarding artwork need to review the proof against the panel break diagram, not just the flat artwork file. If your vendor hasn't provided a panel break overlay or a to-scale mockup showing seam placement, ask for one before routing the file internally.
The other internal checkpoint failure is colour accuracy. Hoarding graphics print in CMYK on large-format substrates, and the output will not match an RGB screen proof. If your internal approval process relies on stakeholders reviewing files on uncalibrated monitors without a CMYK soft proof, you will get colour complaints after install. Set that expectation before the first proof goes out.
How Mall Ops Evaluates the Submission
Mall ops reviews artwork submissions against the centre's hoarding design standards — not your brand guidelines. Those two documents may conflict. Common conflict points include:
- Minimum font size requirements that your brand's preferred type treatment doesn't meet
- Restrictions on photography content — some centres prohibit certain imagery categories in common areas
- Logo placement rules requiring the centre's branding or a "coming soon" message in a specific position
- Finish restrictions — gloss substrates are prohibited in some centres due to glare in high-traffic concourses
The failure mode here is discovering these restrictions after internal creative development is complete. The centre's hoarding design standards document should be in your hands at the briefing stage. If your tenant coordination contact hasn't provided it, request it directly. It's a standard document.
For more on how mall ops teams assess vendor submissions and what affects approval speed, the guide on how mall operations teams evaluate hoarding graphics vendors covers the evaluation criteria in detail.
The Clock Starts When Mall Ops Confirms Approval, Not When You Submit
Submission and approval are not the same event. That distinction matters for timeline management.
Mall ops review typically takes 1–5 business days at most major Canadian centres, though some landlords turn around standard submissions in 48–72 hours. Rush reviews exist but are not guaranteed, and not every centre offers them.
The clock starts when mall ops sends written confirmation of artwork approval. That confirmation is what your print vendor needs to move to production. If your install date is fixed and you're submitting artwork with fewer than 5 business days to spare, you're already in a compressed position.
Build the submission date backward from the install date, not forward from when artwork is ready.
Adapting Campaign Creative to a Hoarding Layout
Brand managers working with existing campaign assets — photography, key visuals, seasonal creative — frequently run into scaling and composition problems when applying those assets to a hoarding format.
A campaign image composed for a 16:9 digital banner or a 4:5 social format does not translate directly to a 40-foot hoarding wall. Subject placement, focal points, and text positioning all need to be reconsidered for the physical format and viewing distance.
The guide on adapting campaign creative to a hoarding layout covers the specific adjustments required, including how to handle panel breaks without compromising the primary visual.
What to Confirm Before Routing Any File for Internal Approval
Before you send a proof to internal stakeholders, confirm:
- The file is sized to the actual hoarding dimensions provided by the landlord — not estimated dimensions
- Panel break positions are marked on the proof
- The primary visual does not land on a panel break
- The file is in CMYK at 300 DPI minimum
- The design meets the centre's hoarding design standards — font size, content restrictions, required messaging
- The installation vendor's COI is in progress or confirmed
If any of those items are unresolved, internal approval is premature. Approving artwork before the file is production-ready means a second round of internal review — and that adds time you typically don't have.
Rapid Retail Graphics handles the full scope on most projects: site survey, artwork templates sized to actual dimensions with panel break markers, print production, and coordinated install. If you're managing a fit-out with a tight handover date, rapidretailgraphics.com has the project details.