Back to Blog

    2026-04-07

    How to Brief a Hoarding Graphics Vendor When You're Already Behind Schedule

    By Rachel Torres — Retail Brand Manager & Project Lead

    Your lease starts Monday. Construction wrapped yesterday. The hoarding graphics vendor needs a brief today.

    This exact scenario plays out across Canadian malls every week. Retail timelines compress, construction runs late, and suddenly you're briefing a graphics vendor with zero margin for error. Here's how to get them everything they need in one organized handoff.

    Gather These Four Things First

    Before you touch the phone, collect these essentials. Missing any one item will cost you 24 hours in back-and-forth.

    1. Exact installation address and mall contact

    Include the specific unit number, mall name, and the operations contact who handles vendor access. Most hoarding installs happen outside trading hours, so your vendor needs the right person's direct number.

    2. Your hard deadline

    Not when you'd prefer it done — when it absolutely must be installed. If the lease kicks in Tuesday and you need photos for the landlord Monday night, say that. Vendors can work backwards from real deadlines but can't read minds about buffer time.

    3. Brand files or campaign creative

    Send vector files (AI, EPS) when possible. High-res PDFs work too. If you only have JPEGs from a previous campaign, include those with a note about quality limitations. Don't apologize for what you have — just be clear about it.

    4. Site photos or drawings

    Even phone photos help. Show the hoarding structure, nearby obstacles, and any existing graphics that need removal. If you have construction drawings with hoarding dimensions, include those.

    Structure Your Initial Email Like This

    Subject: "Rush hoarding graphics - [Mall name] - Install needed by [date]"

    Keep the email short and front-load the critical information:

    • Installation address and deadline
    • Approximate hoarding size (length × height)
    • Mall operations contact for access
    • Brand files attached
    • Your direct phone number

    Skip the background story about why you're behind schedule. The vendor doesn't need context — they need facts.

    What to Expect in the First 24 Hours

    A good hoarding graphics vendor will respond within hours with three things: confirmation they can meet your deadline, a rough cost estimate, and next steps for site measurement.

    Most vendors need to see the site before final artwork and pricing. This usually happens the same day or next morning. They'll coordinate directly with mall operations for access, measure the hoarding, and photograph any obstacles or existing graphics.

    You should receive artwork proofs within 24–48 hours of the site visit, depending on complexity. Review these immediately — every hour counts when you're behind schedule.

    Common Briefing Mistakes That Cost Time

    Sending low-resolution files without mentioning it. If your logo is a 72-DPI JPEG from your website, tell the vendor upfront. They can work with it or source better files, but discovering quality issues during artwork creation wastes precious hours.

    Unclear about brand standards. If your brand has specific color requirements (Pantone colors, for example) or font restrictions, mention these in your brief. Don't assume the vendor will match colors perfectly from a JPEG.

    Not specifying who approves artwork. If the brand manager needs to sign off on proofs, include their contact information and availability. Nothing kills a rush timeline like artwork sitting in someone's inbox over a weekend.

    Forgetting about mall requirements. Some malls have restrictions on hoarding graphics — no certain colors, logos must be a minimum size, or graphics can't extend to the floor. Check with your mall operations team before briefing the vendor.

    Rush Options and Realistic Timelines

    Most hoarding graphics vendors can compress their standard 1–5 business day timeline when needed. Same-day or next-day installation is possible for simple graphics with existing brand files and straightforward hoarding structures.

    Complex artwork, custom colors, or large installations need more time. Be honest about your timeline constraints upfront rather than hoping for miracles later.

    If your deadline is genuinely impossible, ask about partial installation options. Sometimes getting branded panels up on the most visible sections buys you time to complete the rest properly.

    After Installation: Document Everything

    Request photo proof of the completed installation. This serves two purposes: you can confirm the work meets your standards, and you have documentation for your landlord or brand manager.

    Good vendors send completion photos automatically, usually within hours of finishing the install.

    When Standard Briefing Isn't Enough

    Some situations need more than a standard brief. If your hoarding graphics are part of a larger brand launch, if multiple vendors are working the same site, or if the installation requires special equipment or permits, schedule a brief phone call instead of relying on email alone.

    Complex projects benefit from real-time discussion, especially when timelines are compressed.

    The key to briefing any hoarding graphics vendor under pressure is complete information upfront. Gather everything, send it clearly, and respond to questions immediately. Your vendor can work miracles with tight timelines, but they can't work without the right information.

    Ready to get your hoarding graphics installed before your deadline? Get in touch.

    Have a hoarding project coming up?

    Get a Quote